BERRY ST TO SMALL ST DRAINAGE
WrightBarrat where engaged as civil engineers to scope and cost drainage works to an existing drainage way. The works required the design of a piped system to replace an open channel drainage system.
WrightBarrat used manual calculations, AutoCAD and DRAINS software to conduct the detailed drainage design.
View the embedded image gallery online at:
http://wrightbarrat.com.au/index.php/civil-engineering-albury-wodonga/civil-drainage-construction/berry-street-to-small-street-drainage#sigProGalleriacf4d752816
http://wrightbarrat.com.au/index.php/civil-engineering-albury-wodonga/civil-drainage-construction/berry-street-to-small-street-drainage#sigProGalleriacf4d752816
